Jun 30, 2020
Gear doors
- (7 hours)
Category: Main Gear
Glassed the inside of the fuselage in the morning, including both NACA scoops, fresh air scoop and both shelves (back, sides and front). Prepared to fit main gear doors on legs. Shaped the foam for reinforcing gear doors.